{"id":1325,"date":"2024-08-14T12:18:51","date_gmt":"2024-08-14T04:18:51","guid":{"rendered":"http:\/\/www.zeushebei.com\/?p=1325"},"modified":"2026-11-10T12:01:50","modified_gmt":"2026-11-10T04:01:50","slug":"cangzhou-broiler-project","status":"publish","type":"post","link":"https:\/\/www.zeushebei.com\/ru\/project-cases\/cangzhou-broiler-project\/","title":{"rendered":"Cangzhou broiler project"},"content":{"rendered":"<h1>630,000 Broilers, Fifteen Houses: Inside a Multi-Tier Broiler Project in Cangzhou<\/h1>\n<p><em>Fifteen identical houses in Cangzhou, eight rows of three tiers and a forty-day cycle: what it takes to turn a 96-metre building into a broiler unit that runs five or six times a year.<\/em><\/p>\n<hr \/>\n<h2>Project at a glance<\/h2>\n<div class=\"_tableScroll_rve47_199 _tableFill_rve47_252\">\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Location<\/strong><\/td>\n<td>Cangzhou, Hebei, China<\/td>\n<\/tr>\n<tr>\n<td><strong>Project type<\/strong><\/td>\n<td>Multi-tier commercial broiler production<\/td>\n<\/tr>\n<tr>\n<td><strong>Site capacity<\/strong><\/td>\n<td>630,000 birds<\/td>\n<\/tr>\n<tr>\n<td><strong>Houses<\/strong><\/td>\n<td>15<\/td>\n<\/tr>\n<tr>\n<td><strong>Birds per house<\/strong><\/td>\n<td>42,600<\/td>\n<\/tr>\n<tr>\n<td><strong>House footprint<\/strong><\/td>\n<td>96 m \u00d7 18 m (315 ft \u00d7 59 ft)<\/td>\n<\/tr>\n<tr>\n<td><strong>Tier configuration<\/strong><\/td>\n<td>Eight rows \u00d7 three tiers (8 \u00d7 3)<\/td>\n<\/tr>\n<tr>\n<td><strong>Total building area<\/strong><\/td>\n<td>Approx. 25,920 m\u00b2 (279,000 sq ft)<\/td>\n<\/tr>\n<tr>\n<td><strong>Supply scope<\/strong><\/td>\n<td>Full-house package \u2014 pens, feeding, drinking, manure removal, ventilation and cooling, heating, environmental control<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<hr \/>\n<h2>Fifteen houses, one 96-metre module<\/h2>\n<p>The site sits on the flat farmland of Cangzhou, on the North China Plain, with feed grain grown around it and the Bohai Rim market a few hours&#8217; drive away. The houses are laid out as two parallel blocks either side of a central service road, feed silos and service equipment standing at the gable ends.<\/p>\n<p>From the air the pattern is almost monotonous \u2014 which is precisely the intent.<\/p>\n<p>Every house is the same 96 metres by 18 metres. That single module is what makes fifteen houses behave like one operation: the same fan staging, the same feed line lengths, the same catch routine, the same spares on the shelf. A crew that has worked one house has worked all fifteen, and a fault in house 4 looks like a fault in house 12.<\/p>\n<p>The 96-metre length is also an operational choice. It is short enough that a house can be walked end to end in a couple of minutes and that air still reaches the far end with the pressure budget available, and long enough to carry eight rows without wasting floor space on cross aisles.<\/p>\n<h2>Eight rows, three tiers: density without height<\/h2>\n<p>At 42,000 birds per house, the building has to be used in three dimensions. Eight rows by three tiers puts 42,000 birds into a 1,728 m\u00b2 footprint \u2014 roughly 24 birds per square metre of building area, with the tiers doing the work that would otherwise require three times the land.<\/p>\n<p>Three tiers is a deliberate middle ground. It captures most of the density benefit of multi-tier housing while keeping the building low, the access simple and the top tier within easy reach for inspection, vaccination and catch. For a broiler operation turning the house over every seven or eight weeks, that ease of access is not a small detail \u2014 it is the difference between a routine that holds up over years and one that wears the crew down.<\/p>\n<h2>One house, forty days<\/h2>\n<p>Everything in a broiler house happens on a forty-day clock. Day-old chicks arrive, market-weight birds leave, the house is washed down and restarted \u2014 five or six times a year. Nothing in the building stays put for long: the temperature setpoint falls week by week, the birds&#8217; heat output climbs, the feeders are raised, the drinkers are lifted, and the ventilation that nursed 42,000 chicks through their first night is not the ventilation that carries them to market weight.<\/p>\n<p>The first seventy-two hours are the most demanding. Day-old chicks need around 33\u201334 \u00b0C at bird level, high humidity, and air that is warm without being stale \u2014 which means a house that has to heat and ventilate at the same time, in a building designed to dump heat later in the cycle. From there the setpoint falls by roughly three degrees a week while the birds&#8217; own heat output climbs.<\/p>\n<p>By the final week the house is holding well over a hundred tonnes of live bird, each of them generating heat, and ventilation becomes the limiting factor on how the flock performs rather than the feed. That is the design problem a broiler house has to solve: the same building must run as a warm, still nursery in week one and as a high-airflow heat exchanger in week six, with the change managed continuously rather than in steps.<\/p>\n<h2>The systems that carry the cycle<\/h2>\n<div class=\"_tableScroll_rve47_199 _tableFill_rve47_252\">\n<table>\n<thead>\n<tr>\n<th>System<\/th>\n<th>What it does in this house<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Pens<\/strong><\/td>\n<td>Eight rows \u00d7 three tiers, arranged so every tier is reachable from the service aisle for inspection and catch<\/td>\n<\/tr>\n<tr>\n<td><strong>Feeding<\/strong><\/td>\n<td>Feed from the gable-end silos, delivered to pan feeders on every tier and adjusted as the birds grow<\/td>\n<\/tr>\n<tr>\n<td><strong>Drinking<\/strong><\/td>\n<td>Nipple lines on each tier, with pressure and height set to bird age so chicks can reach water from day one<\/td>\n<\/tr>\n<tr>\n<td><strong>Manure removal<\/strong><\/td>\n<td>A belt beneath each tier clearing manure continuously, keeping ammonia down and the litter surface dry<\/td>\n<\/tr>\n<tr>\n<td><strong>Ventilation and cooling<\/strong><\/td>\n<td>Sidewall inlets, exhaust fans and summer cooling, staged from minimum ventilation in week one to full tunnel near market weight<\/td>\n<\/tr>\n<tr>\n<td><strong>Environmental control<\/strong><\/td>\n<td>One controller per house, running a day-by-day setpoint curve and logging temperature, humidity and static pressure<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The point of specifying all of them together is the same as it is in any house: the fan staging follows the fan curve actually installed, the heater output matches the ventilation rate at minimum, and the drinker pressure matches the flow the birds need at each age. On one house that saves commissioning time. Across fifteen, it is what lets a single site run a repeating forty-day cycle without surprises.<\/p>\n<h2>Turnover is the real test<\/h2>\n<p>A broiler house is emptied, washed, disinfected and restocked five or six times a year, and the equipment is expected to survive that for a decade. That puts a different kind of demand on the hardware than a house that keeps one flock for a year: high-pressure washdown, disinfectant, and belts and drinker lines that have to come clean quickly because the next flock is already booked.<\/p>\n<p>It also shapes the site plan. Fifteen houses are not emptied at once. Placement dates are staggered so that the site delivers a steady flow of birds to processing rather than fifteen simultaneous catches, and so that cleanout, maintenance and restocking can be handled by the same crew across the year.<\/p>\n<h2>Catch, uniformity and the people in the house<\/h2>\n<p>Multi-tier housing moves the hardest job in broiler production indoors and upward: catching birds out of three tiers instead of off a litter floor. It is planned work, not improvised work \u2014 which tiers are cleared first, how birds are moved to the loading bay, and how many people are on the house for the shift.<\/p>\n<p>Uniformity is the other reason the layout matters. Birds on the top tier must reach the same weight as birds on the bottom tier, which comes down to feed and water reaching every pen at the same rate and air reaching every tier at the same temperature. An eight-row, three-tier house that is balanced in its first week tends to stay balanced at catch.<\/p>\n<h2>Building at this scale<\/h2>\n<p>Details that repeat decide projects like this: the survey of the house, the tolerance of eight rows over 96 metres, the balance between heating and minimum ventilation in the first week, the order in which systems are commissioned, and the training that lets a local team run a fifteen-house site confidently from the first flock.<\/p>\n<p>ZEUSYANG supplied the complete house package for this project \u2014 pens, feeding, drinking, manure removal, ventilation and cooling, heating and environmental control \u2014 from layout and system specification through installation, commissioning and operator training, across all fifteen houses.<\/p>\n<p><strong>Planning a broiler project?<\/strong>\u00a0Talk to our engineering team about house layout, tier configuration and full-house system specification for your site.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-4509\" src=\"https:\/\/www.zeushebei.com\/wp-content\/uploads\/2024\/08\/cangzhouroujixiangmu.webp\" alt=\"cangzhouroujixiangmu\" width=\"1200\" height=\"800\" srcset=\"https:\/\/www.zeushebei.com\/wp-content\/uploads\/2024\/08\/cangzhouroujixiangmu.webp 1200w, https:\/\/www.zeushebei.com\/wp-content\/uploads\/2024\/08\/cangzhouroujixiangmu-300x200.webp 300w, https:\/\/www.zeushebei.com\/wp-content\/uploads\/2024\/08\/cangzhouroujixiangmu-1024x683.webp 1024w, https:\/\/www.zeushebei.com\/wp-content\/uploads\/2024\/08\/cangzhouroujixiangmu-768x512.webp 768w, https:\/\/www.zeushebei.com\/wp-content\/uploads\/2024\/08\/cangzhouroujixiangmu-600x400.webp 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>630,000 Broilers, Fifteen Houses: Inside a Multi-Tier Broiler Project in Cangzhou Fifteen identical houses in Cangzhou, eight rows of three tiers and a forty-day cycle: what it takes to turn a 96-metre building into a broiler unit that runs five or six times a year. Project at a glance Location Cangzhou, Hebei, China Project type [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1327,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[47],"tags":[],"class_list":["post-1325","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-cases"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/posts\/1325","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/comments?post=1325"}],"version-history":[{"count":4,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/posts\/1325\/revisions"}],"predecessor-version":[{"id":5074,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/posts\/1325\/revisions\/5074"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/media\/1327"}],"wp:attachment":[{"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/media?parent=1325"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/categories?post=1325"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zeushebei.com\/ru\/wp-json\/wp\/v2\/tags?post=1325"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}